Durusu Alım Terminali Modernizasyon İşleri

The PROJECT is aimed at modernizing existing inlet section of DURUSU TERMINAL currently owned and operated by BOTAS and having 2 lines of pipeline (DN=24’’, WT=38.1mm) and an overall Equipment/Materials Class of ANSI 1500 by changing the existing layout of the receiving pig traps to a new layout identified and approved by the BOTAŞ and BSPC (Blue Stream Pipeline Company).  

The modernizing works required to achieve this aim includes, but not limited to, the following works to be executed according to the new layout of the receiving pig traps: 

(a)     Dismantling of the existing installations related to all disciplines (civil, mechanical, piping, electrical, instrumentation, communications and control etc.) as required; 

(b)    Supply and installation of a flow control valve on each line;

(c)     Supply and installation of an ultrasonic flow meter on each line;

(d)    Supply and installation of a pig receiver on each line;

(e)     Supply and installation of insulation joints,

(f)      Supply and installation of valves, pipes, instruments and communication and control materials and equipment;

(g)     Supply and installation for other works related to all disciplines (civil, mechanical, piping, electrical, instrumentation, communications and control etc.)

(h)    Construction of a new Control Building